01 / PROJECT DECISION
Which asbestos project pathway applies to your building?
Property owners can start with professional inspection or testing when the material is unknown, or with a defined work scope where asbestos has already been documented.
Use the project description to record property owner and authorized representative and the material or building system actually involved. Confirmed and merely suspected materials should not be described as the same evidence state.
Before seeking professional consideration, clarify the worksite location, its use, affected area, occupancy and anticipated disturbance. Ask the independent provider to explain where its scope ends and which other professional roles, studies or controls may be required.
AAG organizes a consent-based project enquiry. It does not provide field personnel, create a laboratory result, certify a work area or guarantee that an independent provider will accept the project.
- State the material and condition as known or unknown.
- Provide measurements, drawings or reports when available.
- Verify the credentials and evidence that the specific professional role requires.
- Document expected deliverables, exclusions and project timing.
02 / PROJECT DECISION
How should a project requirement be organized?
Create a brief that states property type, material locations, suspected or confirmed status, project trigger, site access, expected deadlines and records available.
Use the project description to record work scope and timelines and the material or building system actually involved. Confirmed and merely suspected materials should not be described as the same evidence state.
Before seeking professional consideration, clarify the worksite location, its use, affected area, occupancy and anticipated disturbance. Ask the independent provider to explain where its scope ends and which other professional roles, studies or controls may be required.
AAG organizes a consent-based project enquiry. It does not provide field personnel, create a laboratory result, certify a work area or guarantee that an independent provider will accept the project.
- State the material and condition as known or unknown.
- Provide measurements, drawings or reports when available.
- Verify the credentials and evidence that the specific professional role requires.
- Document expected deliverables, exclusions and project timing.
03 / PROJECT DECISION
What should a professional bid comparison include?
Compare proposed scope boundaries, professional credentials, exclusions, waste and monitoring responsibilities, regulatory notifications and completion paperwork.
Use the project description to record material evidence and contractor bid packages and the material or building system actually involved. Confirmed and merely suspected materials should not be described as the same evidence state.
Before seeking professional consideration, clarify the worksite location, its use, affected area, occupancy and anticipated disturbance. Ask the independent provider to explain where its scope ends and which other professional roles, studies or controls may be required.
AAG organizes a consent-based project enquiry. It does not provide field personnel, create a laboratory result, certify a work area or guarantee that an independent provider will accept the project.
- State the material and condition as known or unknown.
- Provide measurements, drawings or reports when available.
- Verify the credentials and evidence that the specific professional role requires.
- Document expected deliverables, exclusions and project timing.
04 / PROJECT DECISION
How do project roles change the request?
A homeowner, facilities manager, general contractor or school project team may need different documentation and decision authority, so the request should identify the authorized buyer.
Relevant state or local licensing and notifications depend on the actual activity and building. OSHA worker protections and applicable EPA requirements serve different purposes, so the correct authority must be verified.
Use the project description to record role and deliverable selection and the material or building system actually involved. Confirmed and merely suspected materials should not be described as the same evidence state.
Before seeking professional consideration, clarify the worksite location, its use, affected area, occupancy and anticipated disturbance. Ask the independent provider to explain where its scope ends and which other professional roles, studies or controls may be required.
AAG organizes a consent-based project enquiry. It does not provide field personnel, create a laboratory result, certify a work area or guarantee that an independent provider will accept the project.
- State the material and condition as known or unknown.
- Provide measurements, drawings or reports when available.
- Verify the credentials and evidence that the specific professional role requires.
- Document expected deliverables, exclusions and project timing.
05 / PROJECT DECISION
How does AAG review submitted projects?
AAG accepts a consented enquiry for manual review and possible sharing with independent providers. It does not award contracts, certify results or guarantee offers.
Use the project description to record property owner and authorized representative and the material or building system actually involved. Confirmed and merely suspected materials should not be described as the same evidence state.
Before seeking professional consideration, clarify the worksite location, its use, affected area, occupancy and anticipated disturbance. Ask the independent provider to explain where its scope ends and which other professional roles, studies or controls may be required.
AAG organizes a consent-based project enquiry. It does not provide field personnel, create a laboratory result, certify a work area or guarantee that an independent provider will accept the project.
- State the material and condition as known or unknown.
- Provide measurements, drawings or reports when available.
- Verify the credentials and evidence that the specific professional role requires.
- Document expected deliverables, exclusions and project timing.
06 / PROJECT DECISION
How should a buyer prepare a asbestos project planning and procurement services enquiry?
The enquiry should state the property and worksite ZIP, required service, material status, work trigger, timing, prior evidence and authorized contact.
Do not submit payment information or sensitive records. Consent to project-specific sharing is separate from the provider selecting or agreeing to perform work.
The following form uses the existing Cloudflare RFQ process, with manual review, security verification and possible independent-provider consideration. AAG may receive compensation for accepted referrals.
- Identify inspection, assessment, removal, encapsulation or an undecided status accurately.
- Describe what changes if this work is delayed, and whether other trades have scheduled access.
Questions before requesting professional consideration
Can AAG perform this service?
No. AAG publishes guidance and may share a permissioned project enquiry with independent providers. AAG performs no asbestos fieldwork.
Does an enquiry guarantee a contractor or professional visit?
No. Provider availability, project acceptance, scheduling and any quote are separately determined by independent professionals.
Can the material be identified by its appearance?
No. The appropriate evidence and professional assessment depend on the material, task and applicable testing requirements.
Are state asbestos requirements the same everywhere?
No. Confirm the project category, responsible authority, training or credentials, and local notifications for the actual worksite.